Temporary Traffic Management, Corridor Accessway Requests (CAR) and Inspections
| FEES |
---|
Traffic Management Plan (TMP) | $100.00 |
TMP Extension/Road Space Boking (Road space booking only applies where a global excavation CAR has been issued) | $25.00 |
Generic TMP (A 12 month TMP to cover works where fairly generic activities are being undertaken) | $300.00 |
Minor Excavation Corridor Access Request (Works are to be less than 3 linear metres in any one direction or will take more than 10 working days to complete) | $150.00 |
Major Excavation Corridor Access Request (Works are greater than 3 linear metres in any one direction or will take more than 10 working days to complete) | $300.00 |
Project Excavation Corridor Access Request (Works exceeding 10 working days in duration and all subdivisions) | $600.00 |
Global Excavation Corridor Access Request (A generic inspection CAR for minor mobile work) | $1,500.00 |
Re-Inspections (Inspection of non-conformance or non-approved traffic management plan or methodology) | $100.00 |
Non-approved works within the road reserve (Where non-approved work is being undertaken and a contractor is removed from site due to the site being dangerous, or they do not have an approved TMP, or there are no qualified staff onsite) | $850.00 |
Royalties on Shingle
| FEES |
---|
Per cubic metre, loose measure from Council pits used for Council works | $2.00 |
Stock Crossing Permit
| FEES |
---|
Per stock crossing | $742.00 |
Overweight Vehicle Permit Fees
Maximum permitted in Heavy Motor Vehicle Regulations
Vehicle Crossing Applications and Inspections
| FEES |
---|
Standard vehicle entrance application | $225.00 |
Standard vehicle crossing fee for retrospective applications, (where work has commenced before the application is made). For applications that do not comply with the vehicle crossing bylaw | $285.00 |
Standard vehicle crossing re-testing (where an onsite test fails and clearly would not have passed) | $112.00 |
Abandoned Cars
| FEES |
---|
Recovery fee per vehicle (Where a vehicle is abandoned the cost of recovery, including administration charges sits with the owner) | Cost Recovery |
Last reviewed date: 13 Nov 2024